Executed Projects

Altawfeer company sales, installs, makes studies, and executes solar water heater and solar heating system (evacuated tubs).The Company has a complete production line to produce solar water heater and its requirement. The company has specialized engineering team who works in researches, development, studying solutions for industrial application and economic feasibility studies for free.

 

The company executed many special projects for hot water like:

 

Talkalakh Hospital

Talkalakh Hospital

Hot water for Talkalakh hospital project, 800 evacuated tubes.

Juveniles Institute

Juveniles Institute

Juveniles Institute building in Homs, 200 evacuated tubes.

Alard Project

Alard Project

Hot water for Alard project, 380 evacuated tubes.

Bulgarian Embassy building

Bulgarian Embassy building

Bulgarian Embassy building in Damascus, 200 evacuated tubes.

Kantia Hotel

Kantia Hotel

Kantia Hotel in Tartus, 300 evacuated tubes.

Dar Zamraia Hotel

Dar Zamraia Hotel

Dar Zamraia Hotel in Aleppo, 150 evacuated tubes.

Royal Palace Hotel

Royal Palace Hotel

Royal Palace Hotel in Latakia, 200 evacuated tubes.

Mount Lebanon

Mount Lebanon

Hot water and heating for three floors building in Mount Lebanon.